Provide a base bid price for both gas powered and diesel powdered vehicles. The Utility Vehicles must meet the following specifications:Ģ) Cargo Box with manual dumping capacityģ) 2-wheel and 4-wheel drive with Power Steeringĩ) Windshield wipers (automated, not manual) Thomas W.The City of Sunbury will receive sealed bids, one (1) original and two (2) copies, for the purchase of three (3) Utility Vehicles at Sunbury City Hall until 12:00 PM prevailing time on July 18, 2022, at 225 Market Street, Sunbury, PA 17801, at which time and place, all bids will be publicly opened and read aloud. The plant is expected to begin operations in early 2018, with construction taking approximately 30 months. It will also benefit from its close proximity to the Susquehanna-Roseland Electric Reliability Transmission Project, a recently completed 146-mile, 500-kV transmission line that was one of several projects fast-tracked by the Obama administration’s Rapid Response Team for Transmission. Panda Hummel will access natural gas through the MARC 1 and Transcontinental regional gas pipelines, relying on ample gas supplies from the Marcellus region. ![]() Siemens Financial Services is also supporting the project with a $125 million equity investment.īechtel will be responsible for the engineering and procurement for the balance of the plant, and the installation, construction and commissioning of the facility. Investment banking firms Goldman Sachs, ICBC, and Investec acted as joint lead arrangers for the senior debt financing of the plant, raising debt capital totaling $710 million. The gas turbines, steam turbine, and generators will be manufactured at the Siemens Charlotte Energy Hub, which is the main production facility for Siemens’ 60-Hz generation business. Siemens will supply the power island equipment, consisting of three SGT6-5000F gas turbines, one SST6-5000 steam turbine, three SGen6-1000A air-cooled generators, one hydrogen-cooled SGen6-2000H generator, three NEM DrumPlus heat recovery steam generators, and a SPPA-T3000 control system. “We have a great relationship with Siemens and look forward to working with them on the Hummel Station project.” “This is the seventh project that Panda has chosen to use Siemens’ advanced technology for our power projects,” said Todd Carter, Panda’s senior partner and president. Two of them, Panda Temple and Panda Sherman, were named 2015 POWER Top Plants. The three companies have partnered on several other plants in Texas and the northeast. Panda, which is building two other combined cycle plants in Pennsylvania-the 829-MW Liberty and Patriot plants in Towanda and Williamsport, respectively-is turning once again to Siemens and Bechtel for a turnkey project. The new Panda Hummel Station power plant will be built adjacent to the retired Sunbury Power Plant on the banks of the Susquehanna River in Pennsylvania. At 1,129 MW, this will be one of the largest coal-to-gas conversion projects in the U.S.ġ. Panda said it would take over some of the existing infrastructure, mainly the electrical interconnection, water intake, and storm water runoff systems. ![]() The new 3 x 1 combined cycle plant, to be named Panda Hummel, will be built on the same site, immediately adjacent to the retired Sunbury Power Plant (Figure 1). The closure was blamed on economic and regulatory factors-competition from natural gas and impending Environmental Protection Agency mercury regulations. Originally built for Pennsylvania Power & Light, it was sold to a private firm in 1999. ![]() The four-unit Sunbury facility, which began operations in 1949, was shuttered last year after 65 years of operation. The 400-MW coal-fired Sunbury Power Plant in Snyder County, Penn., retired in 2014, will be replaced with a three-unit, 1.1-GW combined cycle plant, private equity firm Panda Power Funds announced on Oct.
0 Comments
Leave a Reply. |